Planning Application New bridge Structure Mountain Ash
Planning Application Ref: 17/0131/08 WARD : Mountain Ash East New bridge structure, approximately 60m in length, connecting the A4059 (New Road) with the B4275 (Miskin Road). The proposed structure spans the River Cynon, Aberdare-Cardiff railway line. To facilitate these works, a section of the B4275, approximately 385m long will be upgraded. There will be associated retaining structures…
