Should main roads have priority over side roads when resurfacing?
Posted by Lewis on the 16th April 2013
Please can someone explain why the council have a preference to resurfacing side roads and cul-de-sacs over main roads?
The RCTC dumping ground Llwydcoed and the B4276 by the speed camera road surface is bad, also the B4275 road next to Maesyrarian cemetery Mountain Ash,
I noticed today engineers were resurfacing side roads around Glenboi and Mountain Ash
- Log in to post comments


I think its fair to say that the below answers the point about Llwydcoed, I read this about 4 weeks ago and see the work going on up there daily when passing
This is off the RCT website...............
Highways Investment Scheme continues across Rhondda Cynon Taf, with even more funding being announced over the next few months.
The staggering £19m that has been invested since 2011 will see even more money secured for 2013/14 – making this scheme one of the largest in Wales and further showing the Council’s commitment to investing in the infrastructure within the County Borough, despite extensive budget cuts.
Over 140 miles of highway have already been resurfaced thanks to Rhondda Cynon Taf Council’s multi-million-pound scheme and more extensive works have now begun in Llwydcoed, Aberdare.
Almost £300,000 is being invested in the area to address issues along the B4276 Merthyr Road between the A465 at Baverstocks to Cwmynysminton Road. The works aim to repair the drainage system, strengthen and surface dress sections of the carriageway and carry out associated repairs to the kerbing. Local Ward Members from Llwydcoed - Councillor Anne Crimmings, Councillor John Davies and Councillor Sharon Rees have been keen to see this area benefit from the scheme.
Phase 1 of the works will see drainage works and strengthening of the road near Drift Houses and phase 2 will see strengthening the road near Tre Ifor and surface dressing of the highways.
Councillor Andrew Morgan, Cabinet Member for Frontline Services, said:
"The Council has recognised the concerns expressed by the public at the damage caused from the harsh winters we have experienced and it is for that very reason we are once again investing in our roads during 2013/14 and beyond.
“Our significant investment of £19m since 2011 has already made a substantial difference to residents and demonstrates the Council’s commitment to investing in the infrastructure within the County Borough.
“The investment in Llwydcoed that is now underway will once again see motorist benefiting from this successful scheme that is improving highways up and down the County Borough.”
Councillor Anne Crimmings, Local Ward Member for Llwydcoed, added: “I am pleased that these much needed works have begun in Llwydcoed and I know that they will greatly benefit motorists in the area. This stretch of highway is very well used by both small and large vehicles and this does have an affect on the road especially during the severe winters that we experience.”
The 140miles that have already been covered by the scheme is the equivalent of travelling the whole of Wales from North to South from Wrexham to Pontyclun!
A whopping 80,000 pot holes have also been filled and patched under the scheme along with 50 footways being resurfaced and replaced.
Over 400 streets and roads have benefited from the investment ensuring that residents and motorists can see a marked improvement as they travel around the County Borough.
As the scheme drives forward the Council is urging residents to continue to support the scheme by taking heed of the temporary traffic signs e.g. no road markings, reduced speed limits and diversions whilst these essential works are carried out as it is for their safety and longer term benefit.
That’s fair comment aroundtown any work on carried out on RCT highways is appreciated by all that use them.
Just I find it odd that the main highway is in such a bad state of repair on the B4275 road next to Maesyrarian cemetery Mountain Ash and the engineering work is being prioritised in a cul-de-sac right next to the bigger problem.
If the main highways are not given precedence the next thing the pothole rally of Great Britain will be held in Rhondda Cynon Taf again.
http://www.aberdareonline.co.uk/archive/content/public/forum/message0808...
I agree lewis main roads get more use so guess they should get priority but I cant find a list on the RCT site to say what roads are being done this year