ASDA roundabout.. 2020
Posted by F4p from Aberdare on the 6th April 2020
So is this the 3rd or 4th time that the roundabout has had to be re-engineered?
And at what expense?
Were the original plans drawn in crayon?
- Log in to post comments
Posted by F4p from Aberdare on the 6th April 2020
So is this the 3rd or 4th time that the roundabout has had to be re-engineered?
And at what expense?
Were the original plans drawn in crayon?